Construction of 132 kV Line (2 Phase) through UG XLPE Cable from GSS Sabour to TSS Sabour ,Bhagalpur(8.9 RKM)
Construction of 132 kV Line (2 Phase) through UG XLPE Cable from GSS Safiabad Jmalpurto TSS Jamalpur ,Munger(2.5 RKM)
66 KV Line from 66 KV Sub Station Focal Point Rajpura to 66 KV S/S Naushera 2nd Ckt. 240 mm2. (1.9 RKM)
66 KV Line from 22o KV Sub Station Khassa to 66 KV S/S Attari. 240 mm2. (0.7RKM)
132 kV Double Circuit U/G cable line from 220kV Kunda ki dhani GSS to 132 kV GIS Laxman Dungari .(Approx 9.5KM)
Modification of 132 kV S/C Overhead Chambal-MNSR-HPR line (Approx 1.3 KM) using 630 Sqmm 132 kV XLPE Cable at Jaipur Rajasthan.
Modification of 132 kV S/C line from 220 kV GSS Sanganer to 132 kV GSS Balawala between location no. 22 TTB to 26 TTD with 500 Sq.mm. , 132kVXLPE cable system (3+1 spare cable) on 220kV D/C narrow base towers including detailed route survey, laying and installation of cable alongwith associated accessories/items and civil workss .
Modification work of 132 kV S/C Overhead Chambal-Heerapura linefrom Overhead to Underground cable (3 phase + 1 spare) with 630 Sqmm 132 kV XLPE Cable for proposed Jaipur Metro phase 1D. Route length 0.510KM.
Construction of 132 kV S/C single core XLPE cable for 132 kV S/C Transmission line using 400 Sqmm(3phase + 1spare) of route length 0.785 KM between old railway TSS Gangapur city to New Railway TSS Gangapur city.
Modification of 132 kV S/C line from 220 kV GSS Sanganer to 132 kV GSS Balawala between location no. 22 TTB to 26 TTD with 500 Sq.mm. , 132kVXLPE cable system (3+1 spare cable) on 220kV D/C narrow base towers including detailed route survey, laying and installation of cable alongwith associated accessories/items and civil works.